ACEN refers massive renewables hybrid for federal approval

wind farm with solar panels in foreground and beautiful sunset in background
Image: Shutterstock

ACEN Australia has submitted its proposed 1GW Belyando Energy Project for federal environmental assessment under the EPBC Act.

Related article: Queensland’s state-owned energy firms record $660.9m loss

The massive renewables project proposes to combine up to 440MW of wind, 500MW of solar, and a 500MW/1,600MWh battery at a site 25km south-west of Moranbah in Central Queensland.

The battery energy storage system will have the capacity to store, then discharge enough clean energy to power 5% off all households in Queensland when daily electricity demand peaks.

Belyando is located on several host properties used primarily for grazing stock, and close to the existing transmission network. Once operational, Belyando will coexist alongside agricultural operations.

“Belyando is being designed to respect existing land uses and contribute to long-term energy reliability for Queensland’s industrial backbone,” ACEN said on its project page.

“We’re focused on working collaboratively to shape a project that complements the region’s economic strengths, and delivers genuine, lasting benefits that matter to local people.”

ACEN is also working on the development of the Lilyvale Battery Energy Storage System (BESS) in Queensland—a proposed 440MW/1.76GWh grid-forming battery project about 10km south-west of Tieri in the Central Highlands region of Queensland.

Related article: Queensland Government gassed up over fossil fuel tender

Stay on top of the latest energy news and insights by subscribing to our free weekly e-newsletter and digital magazine.

Previous articleDWER says Chevron deliberately vented methane at Gorgon